Financial Number:
432796-1-52-01
Project Length: 0.12 miles
Project Limits: SR A1A from Meade Street to Oak Street
Start Date: October 11, 2013
Completion Date: May 23, 2014
Contractor: Weekley Asphalt
Estimated Construction Cost: $749,284
Scope of Work: Project improvements include installing new drainage upgrades that will connect to the existing drainage system, removing old asphalt and repaving A1A within the project limits, replacing existing sidewalk along the west side with a new 6-foot wide sidewalk with curb and gutter.