Financial Number:
433688-4-52-01
Project Length: 0.988 Miles
Project Limits: A1A from Sunrise Boulevard to NE 18th Street
Start Date: July 28, 2014
Completion Date: December 23, 2015
Contractor: Russell Engineering, Inc.
Estimated Construction Cost: $11.8 Million
Scope of Work
Project improvements included constructing a wide beachfront promenade on the east side of A1A consisting of a paver sidewalk, installing a decorative sea wall with accent lighting, constructing a raised median in front of Birch State Park, constructing median islands and left turn lanes in the residential section, installing a new underground drainage system, relocating underground utilities, adjusting manhole covers, restoring beach showers, installing decorative, turtle-friendly pedestrian lighting on both sides of A1A, and installing signalized pedestrian crosswalks at Birch State Park, NE 15th Court and NE 17th Street.
Click here for upcoming lane closures |