Financial Number:
230656-1-52-01; 231276-1-52-01
Project Length: 0.71 miles
Project Limits: South of Hillsboro Boulevard to north of the Hillsboro Canal
Start Date: December 2009
Completion Date: July 5, 2012
Contractor: Cone & Graham Inc.
Estimated Construction Cost: $42.5 Million
Scope of Work
Dixie Highway is under construction from Hillsboro Boulevard in Deerfield Beach over the FEC railroad tracks and the Hillsboro Canal to S.W. 18th Street in Boca Raton. A four-lane overpass (flyover) will be built with bicycle lanes and sidewalks on both sides above the railroad tracks, canal, N.E. Second Street, N. River Avenue and N.E. Second Avenue. A pedestrian bridge will be built over the canal east of the overpass. Drainage and landscaping will be added.
Click here for upcoming Dixie Hwy lane closures |