Financial Number:
414561-1-52-01/414561-2-52-01
Project Length: 17 miles
Project Limits: I-75 from the Miami-Dade/Broward County line to Miramar Parkway Interchange
Start Date: September 2010
Estimated Completion Date: September 8, 2012
Contractor: Community Asphalt Corporation
Estimated Construction Cost: $12.1 Million
Scope of Work
Improvements in this project include new auxiliary lanes on I-75 between the entrance ramps at Miramar Parkway and the Homestead Extension of Florida’s Turnpike interchanges, dual left-turn lanes and widening of eastbound Miramar Parkway to northbound I-75 entrance ramp, reconstruction and installation of traffic signals at the southbound I-75 exit ramp to westbound Miramar Parkway, repaving Miramar Parkway between SW 148th Ave and Dykes Road, addition of designated bike lanes and construction of sidewalks on both sides of Miramar Parkway between SW 148th Ave and Dykes Road, and construction of noise walls along with both sides of I-75 in the project limits.