Sheridan Street from the Intracoastal Waterway Bridge to A1A in Hollywood

Financial Number: 429739-1-52-01

Project Length: 0.380 miles

Project Limits: Sheridan Street from the Intracoastal Waterway Bridge to A1A in Hollywood

Start Date: August 18, 2014

Completion Date: March 31, 2015

Contractor: Kiewit Infrastructure

Estimated Construction Cost: $2.1 million

Scope of Work
The improvements under this contract included removing old asphalt and repaving within the project limits, upgrading pedestrian features including curbs and ramps to meet ADA standards, improving drainage which will correct the standing water on the east end crosswalk , improving signalization by modifying the existing left turn green arrow from “protective and permissive” to only “protected”,  installing new signing and street markings, adding a left turn only lane from northbound A1A onto Sheridan Street, adding two right turn lanes from eastbound Sheridan Street onto southbound A1A.


Click here for upcoming lane closures

 

Project Photos

Pre-Construction

Click to view enlarged version/details
Pre contruction photo      
       

During Construction

Click to view enlarged version/details
Pre contruction photo Pre contruction photo Pre contruction photo Pre contruction photo
       

 

 

Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone
75 Express
95 Express