US 1 /State Road 5 Shoulder Widening and Resurfacing Project from South of SE Heritage Boulevard to North of SE Salerno Road

Financial Number: 437838-1-52-01

Project Length: 3.57 miles

Project Limits: From south of SE Heritage Boulevard to north of SE Salerno Road

Start Date: September 16, 2019

Estimated Completion Date: Spring 2021

Contractor: J.W. Cheatham, LLC

Estimated Construction Cost: $8,446,060

Scope of Work:
The improvements on this project include: milling and resurfacing of all travel lanes, turn lanes, and shoulders; widening the shoulders to accommodate 7-foot buffered bicycle lanes; addressing pavement failures at Cove Road and Salerno Road; upgrading sidewalk and pedestrian ramps to meet American with Disabilities Act (ADA) standards; upgrading signing and pavement markings; installing new pedestrian countdown signal heads at multiple signalized intersections; upgrading traffic controller cabinets at all signalized intersections; and installing lighting improvements at Salerno Road and Cove Road intersections.

Click here for upcoming lane closures

 

Project Photos

Pre-Construction

Click to view enlarged version/details
Pre-construction Pre-construction Pre-construction Pre-construction
Pre-construction

During-Construction

Click to view enlarged version/details
Pre-construction Pre-construction
       

 

 

 

Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Kids Zone
© 2014, Florida Department of Transportation District Four