Coral Ridge Drive Mobility Improvement Project from Southgate Boulevard to Wyndham Circle
Financial Number: 437796‐1‐52‐01 & 437798‐1‐52‐01
Project Length: 4.8-miles
Project Limits: Coral Ridge Drive from Southgate Boulevard to Wyndham Circle
Virtual Public Workshop:
Construction Start Date: March 16, 2021
Completion Date: Early 2023
Anticipated Completion Date: Early 2023
Contractor: OHL North America
Estimated Construction Cost: $7.5 million
Scope of Work:
Work consists of widening the roadway to accommodate 6-foot buffered bicycle lanes, constructing sidewalks at existing gaps and reconstructing sidewalk ramps. Improvements also include upgrading vehicle and pedestrian signalization, modifying and relocating drainage structures, repairing bridge deck joints on the Coral Ridge Drive bridge over the C-14 Canal, milling and resurfacing, and adding pavement markings.