Financial Number: 435925‐1‐52‐01
Project Length: 2.728-miles
Project Limits: Prospect Road from SR 870/Commercial Boulevard to SR 811/North Dixie Highway
Start Date: April 13, 2020
Completion Date: Early 2021
Contractor: OHL North America
Estimated Construction Cost: $4.6 million
Scope of Work: Work consists of widening Prospect Road from Commercial Boulevard to Powerline Road to accommodate 5-foot bike lanes in each direction and repurposing the outside travel lanes from Powerline Road to Dixie Highway to accommodate 7-foot buffered bike lanes in each direction. Improvements also include upgrading the existing roadway lighting to LED fixtures at the Powerline Road intersection, installing curb ramps to meet Americans with Disabilities Act (ADA) standards, performing minor drainage improvements, upgrading signage and pavement markings, and milling and resurfacing.