State Road (SR) 7/US 441 at Royal Palm Boulevard/West Copans Road Intersection Improvements Project
Financial Numbers: 449282-1-52-01 and 02
Project Lengths: 0.349 miles
Project Limits: SR 7/US 441 from NW 24th Street to Royal Palm Boulevard/West Copans Road and Royal Palm Boulevard/West Copans Road from NW 57th Terrace/East River Drive to SR 7/US 441
Project Information Video:
Start Date: March 2025
Completion Date: Summer 2026
Contractor: Weekley Asphalt Paving, Inc.
Construction Cost: $3,974,098
Scope of Work:
The project improvements include milling and resurfacing the roadway within the project limits to ensure long-term infrastructure resilience; constructing a right-turn lane along southbound SR 7/US 441 to westbound Royal Palm Boulevard/West Copans Road to improve vehicular capacity and mobility; Modifying the median to extend the southbound SR 7/US 441 left-turn lane to eastbound Royal Palm Boulevard/West Copans Road for additional vehicular storage capacity; upgrading the existing traffic signals with mast arms to enhance long-term infrastructure durability and resilience; installing 11 new light poles and upgrading existing fixtures to LED lighting to enhance nighttime visibility and safety; and upgrading curb ramps, pavement markings, and signage within the project limits to improve visibility and connectivity.