Financial Number: 445623-1-52-01
Project Length: 3.95 miles
Project Limits: SR 9/I-95 from south of Palm Beach Lakes Boulevard to north of 45th Street
Start Date: July 16, 2023
Completion Date: Early 2024
Contractor: Carr Construction, LLC
Estimated Construction Cost: $1.05 million
Scope of Work:
Project improvements include replacing the existing High-Pressure Sodium (HPS) roadway lighting with light-emitting diode (LED) roadway lighting along I-95 in both directions, installation of a Road Weather Information System (RWIS) on the I-95 southbound exit ramp to Palm Beach Lakes Boulevard, and installation of barrier delineators along the existing concrete median barrier walls.