Financial Number: 437834-1-52-01
Project Length: 4.3-miles
Project Limits: US 1 from George Bush Boulevard in Delray Beach to Murano Bay Drive in Boynton Beach
Start Date: October 17 2019
Completion Date: Dec. 23, 2020
Contractor: Hardrives, Inc.
Estimated Construction Cost: $5.4 million
Scope of Work: Work included milling and resurfacing, roadway reconstruction, concrete curb and gutter, driveway, sidewalk, bridge railing, and bike lane installation.