Financial Number: 443996-1-52-01 and 440822-1-52-01
Project Length: 1.76 Miles (443996-1-52-01) and 0.40 miles (440822-1-52-01)
Project Limits: SR A1A from south of Jasmine Lane to north of SR 60/Beachland Boulevard and SR A1A and SR 5/US 1 Turn Lanes
Start Date: August 26, 2022
Completion Date: Late 2023
Contractor: Zahlene Enterprises, Inc.
Estimated Construction Cost: $5.6 million
Scope of Work:
The SR A1A from south of Jasmine Lane to north of SR 60/Beachland Boulevard project improvements consist of repaving and restriping the existing asphalt pavement; widening the roadway to accommodate a 7-foot buffered bicycle lane; constructing a 6-foot sidewalk on the east side (northbound direction); upgrading drainage, signage and pavement markings; upgrading existing curb ramps to meet Americans with Disabilities Act (ADA) standards; adding two signalized pedestrian mid-block crossings at Iris Lane and Dahlia Lane; and, upgrading pedestrian signal and lighting at the intersection of SR A1A and SR 60/Beachland Boulevard. SR A1A and SR 5/US 1 turn lanes project improvements consist of constructing a southbound right turn lane at the intersection of SR 5/US 1 and 8th Street; extending the southbound right turn lane at the intersections of SR A1A and the 17th Street Causeway and SR A1A and SR 60/Beachland Boulevard; and upgrading existing drainage.