State Road (SR) 9/I-95 Northbound and Southbound Off-Ramps at Gatlin Boulevard Roadway Improvements Project
Financial Number: 439761-1-52-01
Project Length: 1.4 mile
Project Limits: From the SR 9/I-95 northbound and southbound off-ramps and Gatlin Boulevard interchange
Start Date: June 10, 2022
Completion Date: Fall 2023
Estimated Construction Cost: $4,627,785.77
Contractor:Halley Engineering Contractors, Inc.
Virtual Public Meeting:
Scope of Work: Project improvements include widening southbound I-95 to provide a 12-foot auxiliary lane and a 12-foot shoulder (10-feet paved); widening I-95 southbound Gatlin Boulevard off-ramp for the addition of a right-turn lane and a left-turn lane; widening the inside of the I-95 northbound Gatlin Boulevard off-ramp to provide three (3) left-turn lanes; widening eastbound and westbound Gatlin Boulevard to provide three 15-foot left-turn lanes; modifying drainage to an open system with dry ponds; installing one cantilever sign structure at the southbound I-95 off-ramp; and adding new signing and pavement markings.