State Road (SR) 9/I-95 Northbound and Southbound Off-Ramps at Gatlin Boulevard Roadway Improvements Project

Financial Number: 439761-1-52-01

Project Length: 1.4 mile

Project Limits: From the SR 9/I-95 northbound and southbound off-ramps and Gatlin Boulevard interchange

Start Date: June 10, 2022

Completion Date: Fall 2023

Estimated Construction Cost: $4,627,785.77

Contractor:Halley Engineering Contractors, Inc.

Virtual Public Meeting:

Scope of Work: Project improvements include widening southbound I-95 to provide a 12-foot auxiliary lane and a 12-foot shoulder (10-feet paved); widening I-95 southbound Gatlin Boulevard off-ramp for the addition of a right-turn lane and a left-turn lane; widening the inside of the I-95 northbound Gatlin Boulevard off-ramp to provide three (3) left-turn lanes; widening eastbound and westbound Gatlin Boulevard to provide three 15-foot left-turn lanes; modifying drainage to an open system with dry ponds; installing one cantilever sign structure at the southbound I-95 off-ramp; and adding new signing and pavement markings.

Documents:

PDF IconVPM SR Gatlin Off-Ramps Presentation

 
 
 

Project Photos

Pre-Construction

Click to view enlarged version/details





Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone