State Road (SR) 9/I-95 Northbound and Southbound Off-Ramps at Gatlin Boulevard Roadway Improvements Project

Financial Number: 439761-1-52-01

Project Length: 1.4 mile

Project Limits: From the SR 9/I-95 northbound and southbound off-ramps and Gatlin Boulevard interchange

Start Date: June 10, 2022

Completion Date: Fall 2023

Estimated Construction Cost: $4,627,785.77

Contractor:Halley Engineering Contractors, Inc.

Virtual Public Meeting:

Scope of Work: Project improvements include widening southbound I-95 to provide a 12-foot auxiliary lane and a 12-foot shoulder (10-feet paved); widening I-95 southbound Gatlin Boulevard off-ramp for the addition of a right-turn lane and a left-turn lane; widening the inside of the I-95 northbound Gatlin Boulevard off-ramp to provide three (3) left-turn lanes; widening eastbound and westbound Gatlin Boulevard to provide three 15-foot left-turn lanes; modifying drainage to an open system with dry ponds; installing one cantilever sign structure at the southbound I-95 off-ramp; and adding new signing and pavement markings.

Point of Contact:

Documents:

PDF IconVPM SR Gatlin Off-Ramps Presentation

 
 
 

Project Photos

Pre-Construction

Click to view enlarged version/details

During Construction

Click to view enlarged version/details





Please click on a link below to view construction projects
in other areas of Treasure Coast:
Martin County ProjectsMartin County St. Lucie CountySt. Lucie County Indian River CountyIndian River County
Florida Department of Transportation
Florida Department of Transportation
Florida 511 Travel Info
FDOT District Four Youtube
SunGuide
Kids Zone