Financial Number: 422641-2-52-01
Project Length: 1.94 miles
Project Limits: From south of Pratt Whitney Road (County Road 711) to SW Jack James Drive
Start Date: April 22, 2019
Estimated Completion Date: Summer 2021
Contractor: Ranger Construction Industries, Inc.
Estimated Construction Cost: $ 12,892,088.57
Scope of Work: The improvements on this project include: reconstructing Kanner Highway from CR 711 to Locks Road from a two-lane undivided highway to a four-lane divided highway with a raised median and curb & gutter; adding seven-foot-wide bicycle lanes from CR 711 to Locks Road; adding a 12-foot-wide shared use path on the east side of Kanner Highway from CR 711 to Locks Road; adding a six-foot-wide sidewalk on the west side of Kanner Highway from CR 711 to Locks Road; installing drainage features that will improve drainage; and resurfacing Kanner Highway from Locks Road to SW Jack James Drive. Access points and turn lanes will be provided throughout the corridor at the following locations: there will be turn lanes at the two signalized intersections CR 711 and Locks Road; full median openings will be at Mary Drive, Tropical Avenue, and SW Old Royal Drive; and a left-turn-only median opening will be located at Beverly Terrace.
Click here for upcoming lane closures
|