Financial Number: 229744-2-52-01
Project Length: 1.348 miles
Project Limits: South of 13th Street to Silver Beach Road
Start Date: July 30, 2012
Completion Date: March 3, 2015
Contractor: Gibbs & Register, Inc.
Estimated Construction Cost: $12.8 million
Scope of Work
Work included milling and resurfacing the existing roadway, drainage and water main installation throughout the project, curb and sidewalk replacement, upgrades to pedestrian and traffic signalization, signage upgrades, and sidewalk and driveway ramp installation to meet ADA standards.
|