State Road (S.R.) 93/I-75 Alligator Alley Resurfacing, Restoration, and Rehabilitation (RRR) Project – Section 2

Road Number: I-75

County: Broward

Contract Number: E4X54

Project Number: 444122-1-52-01

Project Length: 12.39 miles

Project Limits: Mile Post (MP) 31.261 to the Everglades Toll Plaza (MP 18.873)

Start Date: November 2024

Completion Date: Fall 2026

Contractor: Ranger Construction Industries, Inc.

Estimated Construction Cost: $24,576,002

Point of Contact:

Matthew May, P.E. — FDOT Project Manager
matthew.may@dot.state.fl.us or (954) 649-3220

Ossie Larrazabal, P.E. — Senior Project Engineer
ossie@solidcei.com or (786) 255-2869

Trisha Rangil — Community Outreach Specialist
trisha.rangil@exp.com or (754) 283-2929

Scope of Work and Project Improvements

  • Milling and resurfacing the roadway within the project limits to ensure long-term resilience
  • Installing guardrail within the project limits to enhance safety
  • Upgrading signing and pavement markings within the project limits to enhance nighttime visibility

Traffic Impacts

  • Single lane closures along SR 93/I-75 are permitted Sundays at 9:00 p.m. until Fridays at 6:00 p.m.
  • Extended single lane closures at bridge locations are permitted, as needed, for guardrail replacement.
  • Single ramp closures at the Snake Road interchange will be required for milling and resurfacing the off and on ramps. This operation will be scheduled from 9:00 p.m. until 11:00 a.m. on Friday and/or Saturday nights.
  • Detours will be in place to direct motorists and advanced notice will be provided.
  • Access to rest areas and boat ramps may be temporarily closed, as needed, during nighttime paving operations. Closures will be restricted to one ramp at a time.