State Road (S.R.) 713/Kings Highway from North of I-95 Overpass to North of St. Lucie Boulevard

Financial Number: 438379-1-52-01 & 438379-2-52-01

Project Length: 2.610 miles (FPID: 438379-1-52-01: 1.400 miles, FPID: 438379-2-52-01: 1.210 miles)

Project Limits: SR 713/Kings Highway from North of I-95 Overpass to North of St. Lucie Boulevard

Public Meeting: The Public Information Workshop is scheduled for Thursday, February 10, 2022, at 6: 00 pm. The public meeting will be offered in two different formats: virtual and in-person. FPID: 438379-1-52-01: 438379-1-52-01: SR 713/Kings Hwy from North of I-95 Overpass to North of Commercial Circle Split into two construction segments FPID: 438379-4-52-01: SR 713/Kings Hwy from North of I-95 Overpass to Angle Rd. FPID: 438379-5-52-01: SR 713/Kings Hwy from Angle Rd. to North of Commercial Circle

Project Letting: 438379-1-52-01 Projected Letting: July 2026 438379-2-52-01 Projected Letting: Pending construction funding availability

Anticipated Start Date: 438379-1-52-01 Start Date: Fall 2026 438379-2-52-01 Start Date: Pending construction funding availability

Anticipated Completion Date: 438379-1-52-01 Completion Date: Fall 2030 438379-2-52-01 Completion Date: Pending construction funding availability

Estimated Construction Cost: 438379-1-52-01 Estimated Construction Cost:$61 million 438379-2-52-01 Estimated Construction Cost:$43 million

Scope of Work

  • Construction along Kings Highway consists of replacing the existing two lane undivided rural roadway with a newly constructed four-lane suburban divided roadway The proposed roadway will have: A 30-foot wide median (22-foot wide raised plus two 4-foot paved shoulders) Curb and gutters along the inside and outside 7-foot wide outside paved shoulders for use as bike lanes 12-foot wide shared use path adjacent to the road along the west side 6-Foot wide sidewalk along the east Side New lighting System New drainage System New flat slab bridges over the C-25 Canal and Canal No.1 North St. Lucie Water Control District Canal 32E will be shifted to the east Fort Pierce Farms Water Control District Canal No. 4 will be shifted to the west Intersection Improvements at Angle Road & St. Lucie Boulevard