DRAG
img

Search here

State Road (S.R.) 9/I-95 Roadway Resurfacing Project

Road Number: S.R. 9

Local Road Name: I-95

County: St. Lucie

Contract Number: E4X96

Project Number: 455365-1-72-01

Project Length: 5.070 miles

Project Limits: south of Becker Road to south of Gatlin Boulevard

Start Date: July 26, 2026

Completion Date: October 2026

Contractor: Timothy Rose Contracting, Inc.

Estimated Construction Cost: $3,351,064.00

Point of Contact:

Kim Johnson, Community Outreach Specialist
Kim@holtcommunications.net or (772) 801-8736

 

Scope of Work and Project Improvements

  • Resurfacing open grade friction course pavement only to SW Gatlin Boulevard in both directions ravelling of FC-5 northbound & southbound directions. Includes ramps at SW Becker Road and S.R. 9/I-95
  • Resurfacing open grade friction course pavement only to SW Becker Road to SW Gatlin Boulevard in both directions ravelling of FC-5 northbound & southbound directions. Includes northbound and southbound ramps at SW Becker Road

Traffic Impacts

  • Single and double lane closures and interchange ramp closures on S.R. 9/I-95 are permitted nightly, Sunday through Thursday,  7:30 p.m. to 6 a.m.
  • Single and double lane closures on northbound S.R. 9/I-95 are permitted from 8:00 p.m. – 6:00 a.m. Sunday through Thursday
  • Single and double lane closures on southbound S.R. 9/I-95, are permitted from 7:30 p.m. to 5:30 a.m. Sunday through Thursday
  • S.R. 9/I-95 ramp impacts will have single lane, and full ramp closures are permitted throughout the project limits, from 8:00 p.m. to 6:00 a.m.
  • Consecutive ramp closures will not take place at the same time

 

Documents

Useful Links