Road Number: S.R. 858
Local Road Name: Hallandale Beach Blvd
County: Broward
Contract Number: T4752
Project Number: 447548-1-52-01
Project Length: 1.262 miles
Project Limits: From East of S.R. 7/US 441 to SW 44th Avenue
Start Date: May 2026
Completion Date: Fall 2026
Contractor: AUM Construction Inc.
Estimated Construction Cost: $279,999
Carolina Sanchez, P.E. — FDOT Construction Manager
Carolina.Sanchez@dot.state.fl.us or (954) 958-7963
Ashley Parchment — FDOT Construction Administrator
Ashley.Parchment@dot.state.fl.us or (954) 958-7611
Cindy Moshette — Assistant Community Outreach Specialist
Cindy@holtcommunications.net or (786) 555-0601
• Upgrading existing street light poles with LED fixtures throughout the project corridor to improve nighttime visibility.
• Installing new light poles with LED fixtures to enhance safety for all users.
• Work will be done in phases to reduce the impacts of construction on the community.
• Temporary lane closures will be required during construction and will occur at night between 9:00 p.m. and 7:00 a.m. on weeknights and weekends, as needed.
• Access to adjacent properties will be maintained at all times.