Road Number: U.S. 27/S.R. 25
County: Palm Beach
Contract Number: T4736
Project Number: 448136-1-52-01
Project Length: 0.37 miles
Project Limits: Located 27 miles north of the U.S. 27/I-75 Interchange
Start Date: January 5, 2026
Completion Date: Fall 2028
Contractor: Prince Contracting, LLC
Estimated Construction Cost: $20.9 million
Kevin Wells — Community Outreach Specialist
Phone: 728-235-7218, Email: kevin@holtcommunications.net
Project Improvements:
• Dredging a new canal in partnership with South Florida Water Management District for future connection to the EAA reservoir.
• Constructing northbound and southbound U.S. 27/S.R. 25 bridges over the South Florida Water Management District canal to facilitate enhanced stormwater resiliency.
• Milling and repaving the roadway throughout the project limits to enhance infrastructure resilience and safety.
• Constructing drainage and roadside swales for stormwater treatment and storage.
• Installing guardrail and concrete barrier walls to enhance motorist safety.
• Upgrading signage and pavement markings to enhance visibility and safety.