Road: S.R. 882
Local Road Name: Forest Hill Boulevard
County: Palm Beach
Financial Number: 429249-6-52-01
Project Length: 0.0170 miles
Project Limits: S.R. 882/Forest Hill Blvd and Trafalgar Square Plaza
Project Letting: 12/5/2025
Anticipated Start Date: Summer 2026
Anticipated Completion Date: Fall 2026
Estimated Construction Cost: $60,000.00
Tonya Estwick, E.I.
FDOT – District 4 Traffic Operations
(954) 777-4417
tonya.estwick@dot.state.fl.us
To improve safety and traffic operations at the intersection of S.R. 882/Forest Hill Boulevard and the Trafalgar Square Plaza driveway by modifying the existing full-access median opening to directional access.
Modifying the existing median opening at the intersection of S.R. 882/Forest Hill Blvd at Trafalgar Square Plaza from full access to directional access.
This change will restrict left turns from the Trafalgar Square Plaza onto S.R. 882/Forest Hill Blvd, which will increase safety
• Work will be done in phases to reduce the effects of construction on the community.
• Temporary lane closures will be required during construction. Lane closures will be performed at off-peak hours.
• Temporary pedestrian paths and detours will be provided for work impacting existing sidewalks.”