DRAG
img

Search here

S.R.714/SW Martin Hwy from E to SW Stuart W Blvd to W of Citrus Blvd.

Road Number: 714

Local Road Name: S.R. 714

County: Martin

Contract Number: E4X83

Project Number: 448446-1-52-01

Project Length: 3.314

Project Limits: From east of SW Stuart West Boulevard to west of Citrus Boulevard

Start Date: April 2026

Completion Date: Fall 2026

Contractor: Halley Engineering Contractors, Inc.

Estimated Construction Cost: $3,487,657.00

Point of Contact:

Kim Johnson, Community Outreach Specialist
kim@holtcommunications.net or (772) 801-8736

Scope of Work and Project Improvements

The Contract scope includes, but is not limited to, Maintenance of Traffic (standard MOT, arrow boards, and Portable Changeable Message Signs), environmental controls (including sediment barriers), earthwork, concrete work (curb and sidewalk removal and construction), asphalt milling and resurfacing, drainage improvements, pavement markings (raised pavement markers, painted markings, and thermoplastic), signing (single-post and single-column signs), roadway lighting (conduit, pull/splice boxes, and pole assemblies), utility pull box adjustments, mailbox adjustments, and sod placement for site restoration.

Video

Useful Links