North 22nd Avenue/SW 12th Avenue Complete Streets Project

Road Number: S.R. 822 and S.R. 848

Local Road Name: 22nd Avenue and Stirling Road

County: Broward

Contract Number: T4728

Project Number: 445526-1-52-01, 445526-1-52-02

Project Length: 1.027 miles

Project Limits: North 22nd Avenue/SW 12th Avenue from State Road (S.R.) 822/Sheridan Street to S.R. 848/Stirling Road

Start Date: February 1, 2026

Completion Date: Early 2027

Contractor: The Stout Group, LLC

Estimated Construction Cost: $2,926,111

Point of Contact:

Erik Nemati, P.E. — FDOT Construction Project Manager
Erik.Nemati@dot.state.fl.us or (954) 958-7671

Juanita Arias, E.I. — Project Administrator
Juanita.Arias@dot.state.fl.us or (954) 551-8996

Trisha Rangil — Community Outreach Specialist
Trisha.Rangil@exp.com or (754) 283-2929

Meetings

Scope of Work and Project Improvements

  • Milling and resurfacing the existing roadway to ensure long term resiliency.
  • Installing speed tables at strategic locations to reduce speeds and improve pedestrian safety.
  • Installing three raised intersections at SW 10th Street, SW 8th Street and SW 7th Street to enhance visibility and multi-modal safety.
  • Upgrading signing and pavement markings including shared lane markings (sharrows).
  • Upgrading concrete sidewalks and curb ramps to improve accessibility and pedestrian safety.
  • Installing new light poles with LED fixtures throughout the project corridor to enhance nighttime visibility and safety.

Traffic Impacts

  • Single lane closures when needed, as follows:
    • 7:00 a.m. to 6:00 p.m., Monday through Friday
    • 8:00 a.m. to 6:00 p.m., Saturday
  • Side street detours will be required to complete the raised intersections at SW 10th Street, SW 8th Street, and SW 7th Street.