S.R. 816/Oakland Park Boulevard Resurfacing and Box Culvert Rehabilitation Project

Road: S.R. 816

Local Road Name: Oakland Park Boulevard

City: Oakland Park Boulevard

County: Broward

Financial Number: 448409-1-52-01 & 453729-1-52-01

Project Length: 3.49 miles

Project Limits: Oakland Park Blvd from E of I-95 to SR A1A

Project Letting: July 28, 2027

Anticipated Start Date: Fall 2027

Anticipated Completion Date: Spring 2029

Estimated Construction Cost: $7.9 million

Point of Contact:

Vamsee Tirunagari, P.E. – FDOT Project Manager
Florida Department of Transportation
3400 West Commercial Boulevard, Fort Lauderdale, Florida 33309-3421
Phone: 954-777-4061 | Vamsee.Tirunagari@dot.state.fl.us

Meetings

There is a pre-recorded presentation available on the project website for public viewing.
You are encouraged to view the presentation at any time by visiting the project webpage at the link below.
To view the full presentation and for project information, please scan the QR code or visit:
https://tinyurl.com/448409-1-453729-1-Project.

URL

Another public meeting (Construction Open House) will be held prior to construction.
Detailed information about how to keep informed of potential construction impacts will be provided at that meeting.

Project Purpose

Repave and restripe the existing roadway to extend the service life of the pavement, enhance safety for motorists, pedestrians and bicyclists while updating crosswalks, ramps and pedestrian signals to comply with the American with Disabilities Act (ADA).

Project Improvements

PROPOSED IMPROVEMENTS
• Repave the existing roadway to improve the resiliency of our infrastructure.
• Replace and upgrade signs and pavement markings to meet current standards and increase reflectivity.
• Add shared lane markings or “sharrows” to the outside lanes to indicate to motorists that cyclists should be expected in the travel lane.
• Modify curb ramps to comply with ADA to improve accessibility for users with disabilities.
• Make minor repairs to the existing box culvert which carries the North Fork of the Middle River under the intersection of Oakland Park Boulevard and Andrews Avenue.

Construction Impacts

• Work will be done in phases to reduce the effects of construction on the community.
• Temporary lane closures and detours required during construction and will be performed during off-peak hours.
• Pedestrian traffic will be maintained at all times.
• Access to businesses and residences will be maintained during construction.