Road: S.R. 5 / U.S. 1
Local Road Name: Broadway
City: West Palm Beach
County: Palm Beach
Financial Number: 438386-6-52-01
Project Length: 1.142 miles
Project Limits: From 25th Street to 45th Street
Project Letting: May 2027 (Pending Advancement)
Anticipated Start Date: Spring 2027
Anticipated Completion Date: Spring 2029
Estimated Construction Cost: $14.4 Million
Brad Salisbury, P.E.
Florida Department of Transportation
3400 West Commercial Blvd.,
Fort Lauderdale, Fl 33309
954-777-4160
Wednesday, September 30, 2026, at 6:00 p.m.
The purpose of the project is to improve multimodal accessibility by removing the existing median and widening the sidewalk along the east side of the corridor.
• Remove the existing center median/two-way left turn lane.
• Construct a 10-foot shared-use path along the east side of the corridor.
• Reconstruct the existing sidewalk along the west side of the corridor.
• Upgrade pedestrian signals, signing and pavement markings to latest standards.
• Add new School Zone from 39th Street to 41st Street.
• Upgrade drainage infrastructure to accommodate the proposed improvements.
• Replace corridor lighting.
• Work will be phased to minimize community impacts.
• Temporary lane closures and off-peak detours expected.
• Pedestrian access maintained throughout construction.
• Access to businesses and residences maintained at all times.