Road: C.R. A1A
Local Road Name: Dixie Highway
City: Stuart
County: Martin
Financial Number: 447398-1-12-01
Project Length: 8.39 miles
Project Limits: S.E. Grafton Avenue to NW Wright Boulevard
Modeline Acreus – FDOT Project Manager
Phone (954) 777-4347
Email: Modeline.Acreus@dot.state.fl.us
The Florida Department of Transportation (FDOT) will host two Public Information Meetings to provide information about the Feasibility Study taking place along Dixie Highway from SE Grafton Avenue to NW Wright Boulevard in Martin County. The meetings will provide an opportunity for the public to learn more about the project, review project materials, ask questions, and provide comments.
The same information will be presented at both meetings. Attendance at both meetings is not necessary.
Tuesday, October 27, 2026
Virtual Public Information Meeting: 5:00 p.m. – 6:00 p.m.
In-Person Public Information Meeting: 6:00 p.m.
Location: Indian River State College – Chastain Campus
2400 SE Salerno Rd, Stuart, FL 34997
Virtual Meeting registration link: https://tinyurl.com/2pzjh49r
Thursday, October 29, 2026
Virtual Public Information Meeting: 5:00 p.m. – 6:00 p.m.
In-Person Public Information Meeting: 6:00 p.m.
Location: Flagler of Stuart
201 SW Flagler Ave, Stuart, FL 34994
Virtual Meeting registration link: https://tinyurl.com/2p9s4byc
The purpose of the project is to prepare a feasibility study for the SUN Trail Sailfish Capital Trail. The project is evaluating a 12-foot-wide shared use path along the Dixie Highway corridor from SE Grafton Avenue to NW Wright Boulevard over the St. Lucie River that will serve as part of the East Coast Greenway (ECG)
Evaluate a 12-foot-wide shared use path to provide a continuous segment for the implementation of East Coast Greenway