DRAG
img

Search here

S.R. 9/I-95 Interchange Improvements Project at C.R. 809/Northlake Boulevard

Road Number: S.R. 9

Local Road Name: I-95

County: Palm Beach

Contract Number: T4666

Project Number: 435803-1-52-01/02, 435803-1-56-01/02

Project Length: 4.319 miles

Project Limits: S.R. 9/I-95 from south of C.R. 809/Northlake Boulevard to south of S.R. 786/PGA Boulevard, and on C.R. 809/Northlake Boulevard from S.R. 809/Military Trail to Silverthorne Drive

Start Date: November 2026

Completion Date: Summer 2029

Contractor: OHLA-USA, Inc.

Estimated Construction Cost: $54.6 million

Point of Contact:

Joe Marzi, P.E.— FDOT Project Manager
Joseph.Marzi@dot.state.fl.us or (561) 370-1152

Arie Saraga, P.E.— Project Administrator
ASaraga@EPlusEng.com or (954) 275-0602

Meredith Cruz— Community Outreach Specialist
mcruz@cruz-pr.com or (561) 589-9584

Scope of Work and Project Improvements

  • Milling and repaving I-95 and Northlake Boulevard
  • Widening the I-95 exit ramps to Northlake Boulevard and adding a Wrong Way Driving Detection System
  • Widening Northlake Boulevard under I-95 to add a fourth though-lane
  • Adding additional turn lanes and bike lanes along Northlake Boulevard
  • Performing ITS, signalization and drainage improvements
  • Upgrading lighting, signage and pavement markings to enhance the safety for motorists, cyclists and pedestrians

Useful Links