DRAG
img

Search here

S.R. 710/SW Warfield Blvd. & Garcia Drive

Road: S.R. 710

Local Road Name: SW Warfield Blvd.

City: Indiantown

County: Martin County

Financial Number: 439745-3

Project Length: .165 miles

Project Limits: INTERSECTION OF SR-710/SW WARFIELD BLVD & GARCIA DR

Anticipated Start Date: Winter 2027

Anticipated Completion Date: Summer 2027

Estimated Construction Cost: $1.6 million

Point of Contact:

FDOT PM: Robert Lopes, P.E.
Robert.Lopes@dot.state.fl.us
Direct: 954-777-4425
Toll free at (866) 336-8435; Extension: 4425
Florida Department of Transportation
3400 West Commercial Boulevard
Fort Lauderdale, FL 33309

Project Purpose

To improve intersection safety and operations by installing a new traffic signal at S.R. 710 and Garcia Drive and relocating the existing midblock crossing to the intersection.

Project Improvements

  • Install new traffic signal at the S.R. 710 and Garcia Drive intersection.
  • Remove the existing mid-block pedestrian crossing located just east of Indianwood Drive.
  • Repave and restripe the roadway within the vicinity of the intersection.
  • Upgrade signs and pavement markings to meet current standards and increase reflectivity.
  • Provide lighting at the new signalized intersection.

Construction Impacts

  • Work will be done in phases.
  • Temporary lane closures will be required during construction. Lane closures will be performed at off-peak hours.
  • Access to properties will be maintained during construction.
  • Pedestrian traffic will be maintained at all times.

Useful Links