I-95 at Linton Boulevard Interchange Design Project

Road: S.R. 9

Local Road Name: County Road (C.R.) 782/Linton Boulevard

City: City of Delray Beach

County: Palm Beach

Financial Number: 435384-2-52-01

Project Length: 0.5 miles

Project Limits: I-95 at Linton Boulevard Interchange

Project Letting: Spring 2027

Anticipated Start Date: Summer 2027

Anticipated Completion Date: Summer 2029

Estimated Construction Cost: $28.5 million

Point of Contact:

Greg Jett, P.E., FDOT Project Manager 
3400 W Commercial Boulevard
Fort Lauderdale, FL 33309
gregory.jett@dot.state.fl.us (954) 777-4565

Meetings

Virtual Public Meeting: July 22, 2026 at 6 p.m
To participate in the virtual public meeting from your computer, tablet, or smartphone please register using the
following link or QR code:

https://tinyurl.com/523ne397

Participants can also dial in using their phone:
Dial in number: +1 (877) 309-2074
Access code: 247-938-971

In-Person Public Meeting: July 23, 2026 at 6 p.m.
at the Old School Square located at 51 N. Swinton Avenue Delray Beach, FL 33444

Project Purpose

To improve traffic operations, safety, and mobility within the interchange and along the surrounding roadway network. The project is intended to reduce congestion and traffic spillback onto the I-95 mainline, improve merging movements, enhance roadway operations for motorists, and improve accessibility for pedestrians through Americans with Disabilities Act (ADA) related upgrades.

Project Improvements

The project includes reconfiguring the existing interchange ramps into a tight diamond interchange configuration and adding auxiliary lanes to improve traffic flow, operational efficiency, and safety. Additional improvements include roadway resurfacing and repaving, upgrades to signing and pavement markings, lighting enhancements, drainage modifications, and landscape improvements within the existing median. The project also includes upgrades to existing curb ramps, crosswalks, and detectable warnings to improve pedestrian accessibility and meet Americas with Disabilities Act (ADA) criteria.

Construction Impacts

• Work will be done in phases to reduce the impacts to the community.
• Temporary lane closures will be required.
• Pedestrian traffic will be maintained.
• Access to properties along the corridor will be maintained during construction.