DRAG
img

Search here

Sailfish Capital Trail Feasibility Study

Road: C.R. A1A

Local Road Name: Dixie Highway

City: Stuart

County: Martin

Financial Number: 447398-1-12-01

Project Length: 8.39 miles

Project Limits: S.E. Grafton Avenue to NW Wright Boulevard

Point of Contact:

Modeline Acreus – FDOT Project Manager
Phone (954) 777-4347
Email: Modeline.Acreus@dot.state.fl.us

Meetings

Public Information Meetings details coming soon.

Project Purpose

The purpose of the Sailfish Capital Trail Feasibility Study is to evaluate a 12-foot-wide shared use path along the Dixie Highway corridor from S.E. Grafton Avenue to N.W. Wright Boulevard that will serve as part of the East Coast Greenway.

Project Improvements

Provide a 12-foot-wide shared-use path along the Dixie Highway corridor to improve regional connectivity as part of the Shared-Use Non-motorized (SUN) Trail network and East Coast Greenway.

Useful Links