DRAG
img

Search here

S.R. 5/S Federal Highway from US 1/S.R. 5/N Dixie Highway to 10 Avenue S Resurfacing, Restoration, and Rehabilitation (RRR) Project

Financial Number: 449832-1-52-01

Project Length: 0.8 miles

Project Limits: State Road 5/S Federal Highway from US 1/SR 5/N Dixie Highway to 10 Avenue South

Public Meeting: <p>Virtual Public Workshop: Wednesday, October 29, 2025, at 6 p.m. Link to registration page: https://tinyurl.com/2uaf8d65 In Person Public Workshop: Thursday, October 30, 2025, at 6 p.m.</p>

Project Letting: Summer 2026

Anticipated Start Date: Summer 2026

Anticipated Completion Date: Spring 2027

Estimated Construction Cost: $1.0 M

Point of Contact:

Damaris Williams, P.E. — FDOT Project Manager Phone: (954) 777-4679 Email: Damaris.williams@dot.state.fl.us

Scope of Work

  • Repave the existing roadway to improve the resiliency of our infrastructure Add “shared lane” pavement markings to help alert drivers that bicyclists may be present and are allowed to use the entire traffic lane Click Bike facilities for more information. Replace and upgrade signs and pavement markings to meet current standards and increase reflectivity Reconstruct damaged sidewalks and pull boxes to improve mobility and access Upgrade pedestrian curb ramps to add detectible warning surfaces where they are missing to meet ADA at various intersections

Construction Impacts

Work will be done in phases to reduce the effects of construction on the community Temporary lane closures will be required during non-peak hours Pedestrian traffic will be maintained at all times Access to properties along the corridor will be maintained during construction

Useful Links

// Image Grid Start 20h March // Image Grid Eng 20h March