S.R. 824/PEMBROKE ROAD FROM OLEANDER DRIVE TO WEST OF SOUTH 61ST AVENUE

Financial Number: 446372‐1‐52‐01

Project Length: 2.05 Mile

Project Limits: From Oleander Drive to west of South 61st Avenue

Project Letting: Jul-23

Anticipated Start Date: Fall 2023

Anticipated Completion Date: Fall 2025

Estimated Construction Cost: $3.4 Million

Point of Contact:

Jamie Polidora, PE, PhD — FDOT Project Manager Phone: (954) 777-4633 Email: jamie.polidora@dot.state.fl.us

Project Purpose

To extend the service life of the roadway by repaving and restriping

Scope of Work

  • Resurface and restripe roadway pavement Upgrade curb ramps to meet current standards Upgrade signs and pavement markings Upgrade existing signals at intersections Upgrade signalized intersection lighting with Light Emitting Diode (LED) luminaires Minor drainage improvements

Construction Impacts

Construction will be done in phases to reduce the effects of construction on the community. Local impacts such as events, holidays and peak seasons will be considered. Short-term lane closures will occur during non‐ peak hours on non-event days: Daytime: 9:30 a.m. to 3:30 p.m. Nighttime: 9:00 p.m. to 7:00 a.m. Access to businesses and residences will be maintained at all times.