Financial Number: 448417-1-52-01
Project Length: 2.4 miles
Project Limits: State Road (SR) A1A/South Ocean Boulevard from North of Ibis Way to North of Emerald Beach Way
Project Letting: Dec-25
Anticipated Start Date: Spring 2026
Anticipated Completion Date: Spring 2027
Estimated Construction Cost: $3.2 Million
Vandana Nagole, P.E., CPM— FDOT Project Manager Phone: (954) 777-4281 Email: Vandana.Nagole@dot.state.fl.us
Repave and restripe the existing roadway to extend the service life of the pavement and enhance safety for motorists and cyclists.
Work will be done in three (3) phases to reduce the impacts to the community. During Phase I, the road will be narrowed to one lane to construct the drainage improvements in front of 1800 Block for approximately 270 feet for approximately six (6) weeks. Traffic patterns will be maintained by flagger. Lane closures will occur during daytime and nighttime hours on non-event days for Phase I. Lane closures will occur during daytime hours on non-event days for Phases II and III. Pedestrian traffic will be maintained within the existing sidewalk limits with a temporary walkway outside of the work zone. Access to properties along the corridor will be maintained during construction.