Financial Number: 448404-1-52-01
Project Length: 1.568 Miles
Project Limits: State Road (S.R.) 820/Hollywood Boulevard from South 44 Avenue to West of S.R. 9/Interstate 95 (I-95)
Public Meeting: <p>Tuesday, April 2, 2024, at 6:00 p.m. The public meeting was conducted both in-person and virtually simultaneously. The public meeting took place at the Hollywood Branch Library located at 2600 Hollywood Boulevard, Hollywood, Florida 33020. The virtual public meeting took place via GoToWebinar. Participants attended in-person or virtually. The public meeting consisted of a formal presentation followed by an open discussion. Staff was available to answer questions and provide assistance. Comments and questions were answered in the order received. Questions not answered during the event, a response will be provided in writing at a later date.</p>
Anticipated Start Date: Winter 2025
Anticipated Completion Date: Summer 2026
Estimated Construction Cost: $4.4 Million
Mr. Lance Kevin Jones Jr, P.E. — FDOT Project Manager Phone: 954-777-4680 Email: lance.jones1@dot.state.fl.us
The Resurfacing, Restoration and Rehabilitation (RRR) project will extend the service life of the pavement, enhance roadway safety, and improve operating characteristics of the corridor.
Work will be done in phases to reduce the effects of construction on the community Temporary lane closures will be required during non-peak hours on non-event days Access to businesses and residences will be maintained at all times No detours are necessary Existing bike lane access between North Circle Drive and North Park Road will be maintained during construction