DRAG
img

Search here

State Road (S.R.) 820/Hollywood Boulevard from South 44 Avenue to West of SR 9/Interstate 95 (I-95)

Financial Number: 448404-1-52-01

Project Length: 1.568 Miles

Project Limits: State Road (S.R.) 820/Hollywood Boulevard from South 44 Avenue to West of S.R. 9/Interstate 95 (I-95)

Public Meeting: Tuesday, April 2, 2024, at 6:00 p.m. The public meeting was conducted both in-person and virtually simultaneously. The public meeting took place at the Hollywood Branch Library located at 2600 Hollywood Boulevard, Hollywood, Florida 33020. The virtual public meeting took place via GoToWebinar. Participants attended in-person or virtually. The public meeting consisted of a formal presentation followed by an open discussion. Staff was available to answer questions and provide assistance. Comments and questions were answered in the order received. Questions not answered during the event, a response will be provided in writing at a later date.

Anticipated Start Date: Winter 2025

Anticipated Completion Date: Summer 2026

Estimated Construction Cost: $4.4 Million

Point of Contact:

Mr. Lance Kevin Jones Jr, P.E. — FDOT Project Manager Phone: 954-777-4680 Email: lance.jones1@dot.state.fl.us

Scope of Work

  • Repave and restripe the existing roadway Upgrade pedestrian curb ramps to meet Americans with Disabilities Act (ADA) standards Upgrade sidewalk and transit stops Upgrade signing and pavement markings Upgrade Intersection lighting, and pedestrian signals at three signalized intersections (North/South 35 Avenue, North/South Park Road, and Entrada Drive) and one signalized midblock crossing (Calle Grande Drive) within the project limits Install guardrails at approach ends of bridge (No. 860599) over the canal just west of I-95

Useful Links