DRAG
img

Search here

STATE ROAD (S.R.) 93/I-75 FROM S.R. 862/I-595 & S.R. 869/SAWGRASS EXPRESSWAY INTERCHANGE TO S.R. 25/US 27 ROADWAY LIGHTING SAFETY IMPROVEMENTS

Financial Number: 451076-1-52-01

Project Length: 7.67 miles

Project Limits: State Road (SR) 93/I-75 from SR 862/I-595 & SR 869/Sawgrass Expressway Interchange to SR 25/US 27

Project Letting: July 2026

Anticipated Start Date: Winter 2027

Anticipated Completion Date: Winter 2029

Estimated Construction Cost: $7 Million

Point of Contact:

Lance Kevin Jones Jr., P.E. – FDOT Project Manager
3400 West Commercial Boulevard
Fort Lauderdale, Florida 33309
Phone: (954) 777-4680
Toll Free (866) 336-8435 Ext. 4680
Email: lance.jones1@dot.state.fl.us

Scope of Work

  • Install new lighting along the I-75 mainline from the bridge over Weston Road to east of US 27
  • Provide shielding for light fixtures west of Bonaventure Boulevard to minimize potential glare to nearby residential developments
  • Upgrade the existing lighting at the Glades Parkway Interchange for uniformity of lighting
    Upgrade existing lighting along the I-75 curve (near the I-595/Sawgrass Expressway interchange) with Light Emitting Diode (LED) fixtures to improve energy efficiency and enhance light quality and lifespan

Documents

Useful Links