DRAG
img

Search here

Advance Wrong Way Driving Detection Systems Project

Road Number: S.R. 862 and S.R. 9

Local Road Name: I-595 and I-95

County: Broward and Palm Beach

Contract Number: T4737

Project Number: 451597-1-52-01 & 451598-1-52-01

Project Limits: On eleven exit ramps along State Road (S.R.) 862/I-595 and State Road (S.R.) 9/I-95

Start Date: October 2026

Completion Date: Summer 2027

Contractor: Traffic Management Systems

Estimated Construction Cost: $2,856,391

Point of Contact:

Erik Nemati, P.E. — FDOT Construction Project Manager
erik.nemati@dot.state.fl.us or (954) 299-6441

Juanita Arias, E.I — Project Administrator
juanita.arias@dot.state.fl.us or (954) 551-8996

Trisha Rangil — Community Outreach Specialist
trisha.rangil@exp.com or (754) 283-2929

Scope of Work and Project Improvements

  • Installing flashing beacons, wrong-way signage, and Intelligent Transportation System (ITS) devices at eleven exit ramps to enhance safety by detecting wrong-way drivers.
  • Integrating the wrong-way driving detecting system/ITS with the Regional Transportation Management Center (RTMC) to aid in alerting motorists and notifying law enforcement.

Traffic Impacts

  • Full ramp closures are permitted, as needed, 8:30 p.m. to 6:30 a.m., Sunday through Thursday.
  • Shoulder closures are permitted as needed.

Documents

Useful Links