6th Avenue South Improvements at State Road (S.R.) 9/I-95

Road: I-95

Areas: Central

Project Number: 436963-1-52-01, 436963-1-56-02

Project Length: Approximately 1 mile

Project Limits: 6th Avenue South from Grove Street to South C Street and the S.R. 9/I-95 interchange ramps

Start Date: November 13, 2023

Completion Date: Late 2025

Contractor: The Ryan Companies

Estimated Construction Cost: $17,920,542.94

Point of Contact:

Meredith Cruz, Community Outreach Specialist, Phone: (561) 589-9584, Email: mcruz@cruz-pr.com

Scope of Work

  • Project improvements consist of lengthening the turn lanes on 6th Avenue South.
  • Adding an exclusive right turn lane to the S.R. 9/I-95 northbound on ramp.
  • Adding an additional right turn lane to the SR.. 9/I-95 southbound on ramp.
  • Lengthening the northbound left turn lane at A Street.
  • Constructing 6-foot sidewalks on both sides of 6th Avenue South
  • Constructing 7-foot bicycle lanes on both sides of 6th Avenue South.
  • Installing Wrong-Way Driving Countermeasures on the S.R. 9/I-95 northbound and southbound exit ramps.
  • Constructing 16-foot ground-mounted sound walls along the SR 9/I-95 northbound exit ramp and south side of 6th Avenue South.
  • Constructing new gravity wall, curb and gutter, traffic separator, median barrier, sidewalk and driveway along 6th Avenue South within project limits.
  • Upgrading drainage, signage, lighting, signalization and pavement markings, Intelligent Transportation System (ITS) upgrades.
  • Relocation of water, sewer and utilities for the City of Lake Worth Beach.