Copans Road Mobility Improvements Project from State Road (S.R.) 7/US 441 to NW 49th Terrace

Road: Copans Rd.

Areas: Northeast

Project Number: 429576-5-52-01, 429576-5-52-02

Project Length: 0.822 miles

Project Limits: Copans Road Mobility Improvements Project with limits on Copans Road between S.R. 7/U.S. 441 and NW 49th Terrace, in the cities of Coconut Creek and Margate

Start Date: July 2024

Completion Date: Fall 2025

Contractor: General Asphalt Company, LLC

Estimated Construction Cost: $4,964,677

Point of Contact:

Trisha Rangil, Community Outreach Specialist, Phone:(754) 283-2929, Email: trisha.rangil@exp.com

Scope of Work

  • Project improvements consist of reconstructing the existing roadway and sidewalk to accommodate a 9 foot Shared Use Path along project limits. Additionally, the project includes improving drainage.
  • Upgrading curb ramps, signs, and pavement markings along project limits.
  • Upgrading pedestrian signalization on Copans Road at the intersections of S.R. 7/U.S. 441 and Banks Road.