Bridge Rehabilitation Project

Road Number: S.R. 5 & S.R. 848 Old Griffin Road & N. 58th Avenue

County: Broward

Contract Number: E4X91

Project Number: 449243-1-52-01

Project Length: 0.04 miles

Project Limits: Bridge No. 860001: State Road (S.R.) 5/U.S. 1 over the Dania Cut-off Canal, and Bridge No. 860591: S.R. 848/Stirling Road over the Canal C-10

Start Date: March 2026

Completion Date: Early 2027

Contractor: M & J Construction Company of Pinellas County, Inc

Estimated Construction Cost: $2,224,462

Point of Contact:

Erik Nemati, P.E. — FDOT Construction Project Manager
erik.nemati@dot.state.fl.us or (954) 299-6441

Matthew Pearson — Project Administrator
matthew.pearson@dot.state.fl.us or (954) 789-4150

Trisha Rangil — Community Outreach Specialist
trisha.rangil@exp.com or (754) 283-2929

Scope of Work

• Replacing the existing bridge expansion joints with new Ultra High-Performance Concrete joints (UHPC).
• Milling and resurfacing the asphalt over the bridge decks for long term resiliency.

 