State Road (S.R.) 714/SW Martin Highway from east of SW Stuart W Boulevard to west of Citrus Boulevard

Road Number: S.R. 714

County: Martin

Contract Number: E4X83

Project Number: 448446-1-52-01

Project Length: 3.314

Project Limits: From east of SW Stuart West Boulevard to west of Citrus Boulevard

Start Date: April 2026

Completion Date: Fall 2026

Contractor: Halley Engineering Contractors, Inc.

Estimated Construction Cost: $3,487,657.00

Point of Contact:

Kim Johnson — Community Outreach Specialist
kim@holtcommunications.net or (772) 801-8736

Sara Storey — FDOT Project Manager
sara.storey@dot.state.fl.us or (772) 254-3922

Hemberth Salazar — Project Administrator
hemberths@azimuth360.cc or (786) 306-9269

 

Scope of Work and Project Improvements

  • Repaving and restriping the roadway to enhance infrastructure resiliency and safety.
  • Upgrading signage and pavement markings along the project limits to improve visibility.
  • Widening eastbound and westbound SW Boat Ramp Avenue to accommodate turn lanes.
  • Installing new light poles at SW Boat Ramp Avenue.

Traffic Impacts

  • Lane closures will take place along S.R. 714/SW Martin Highway and SW Boat Ramp Avenue.
  • Lane closures are allowed during non-peak hours, daily, from 7:00 p.m. to 6:00 a.m.
  • Flaggers will be on site directing traffic for two-way vehicular movement in one travel lane during widening and paving.
  • During construction the speed limit shall be reduced from 50 miles per hour (MPH) to 45 MPH.
  • Sidewalks, business, and residential access will be maintained at all times.