Lighting project from S.R. 805 (US 1/N. Dixie Hwy) from N of Lucerne Ave to WPB canal

Road: S.R. 805

Contract Number: T4743

Project Number: 447553-1-52-01; 447551-1-52-01

Project Limits: SR-805/Dixie highway from north of Lucerne Avenue to WPB canal

Start Date: 5/8/26

Completion Date: 3/13/27

Contractor: SICE, Inc.

Estimated Construction Cost: $2,487,603

Point of Contact:

Kevin Wells, Community Outreach Specialist (728) 235-7218
Kevin@holtcommunication.net

Scope of Work

  • The Improvements under this Contract consist of , but are not limited to, MOT (traffic officer,
  • standard, pedestrian LCD, Arrow Board, PCMS, barricade, radar speed), protections (sediment, inlet),
  • concrete (removal, sidewalk, driveways, curb, curb and gutter), pavement markings (detectable), signing
  • (single-column), pull/splice box, conduit, fiber optic locator, lighting (conductors, luminaire, pole
  • complete, pole complete remove, cable distribution), and electrical (power service, service wire, load
  • center rework), along State Road 805 (US-1/North Dixie Highway) from WB State Road 802 (Lucerne
  • Avenue) to Canal C-51 for 1.915 miles in Lake Worth Beach, and along State Road 9 (I-95) from 12th Avenue
  • S to 10th Avenue N for 1.658 miles in Lake Worth Beach, Palm Beach County.