State Road (S.R.) 7/U.S. 441 Resurfacing, Restoration, and Rehabilitation Project at S.R. 802/Lake Worth Road

Road Number: S.R. 7/U.S. 441

Contract Number: T4702

Project Number: 445882-1-52-01

Project Length: 0.225 miles

Project Limits: S.R. 7/U.S. 441 at S.R. 802/Lake Worth Road

Start Date: April 2026

Completion Date: Late 2026

Contractor: The Stout Group

Estimated Construction Cost: $3.4 Million

Point of Contact:

Kevin Wells, Community Outreach Specialist

Phone: (728) 235-7218, Email: kevin@holtcommunications.net

Scope of Work

Project Improvements:

  • Milling and repaving the roadway throughout the project limits to enhance infrastructure resilience and safety for the community.
  • Widening to provide a dedicated northbound to eastbound right-turn lane to alleviate congestion on S.R. 7/U.S. 441 at S.R. 802/Lake Worth Road.
  • Constructing a sidewalk along the east side of S.R. 7/U.S. 441 and upgrading ADA curb ramps along the existing sidewalk to enhance pedestrian safety.
  • Upgrading signing and pavement markings by adding high emphasis crosswalks and upgrading to steel strain poles with LED lighting at the signalized intersection to enhance visibility and safety.
  • Upgrading signalization to improve traffic operations.
  • Modifying the existing guardrail along the east side of S.R. 7/U.S. 441 for enhanced safety.

 