DRAG
img

Search here

S.R, 9/I-95 from south of Becker Rd to South of Gatlin Blvd

Road: S.R. 9

Project Number: 455365-1-72-01

Project Length: 5.070 miles

Project Limits: SR 9/I-95 from south of Becker Rd to South of Gatlin Blvd

Estimated Construction Cost: $5,600,000

Point of Contact:

Joanne Barone, Project Administrator II, Phone: (772) 429-4952, Email: Joanne.barone@dot.state.fl.us

Scope of Work

  • Resurfacing open grade friction course pavement only to Gatlin both directions ravelling of FC-5 NB & SB directions. Includes ramps at Becker and I-95
  • Becker to Gatlin both directions ravelling of FC-5. NB & SB directions. Also includes NB & SB ramps at Becker Rd.

Useful Links