Skid Hazard Overlay NB SR-9/I-95 Exit Ramp to WB SR-68/Orange Ave

Road: S.R. 9

Contract Number: T4733

Project Number: 449281-1-52-01

Project Length: 0.291 miles

Project Limits: NB SR-9/I-95 Exit Ramp to WB SR-68/Orange Ave.

Start Date: 3/20/26

Completion Date: 3/20/26

Contractor: C.W. Roberts

Estimated Construction Cost: $840,956

Point of Contact:

Matthew Bazin, Project Administrator , Phone: (772) 429-4865, Email: Matthew.Bazin@dot.state.fl.us

Scope of Work

  • Systematic loop ramps safety assessment- widen the outside paved shoulder along the ramp mill and resurface the ramp with high friction surface enhance existing lighting along the ramp (by re-lamping with led lights) SHSP emphasis area- lane departure crashes