DRAG
img

Search here

Southwest Port St. Lucie Boulevard Widening Project

Local Road Name: Port St. Lucie Blvd.

County: St. Lucie

Contract Number: T4575

Project Number: 431752-5-52-01

Project Length: 1.076 miles

Project Limits: Southwest Port St. Lucie Boulevard from south of Southwest Paar Drive to south of Southwest Alcantarra Boulevard in the City of Port St. Lucie

Start Date: September 8, 2025

Completion Date: Fall 2028

Contractor: Roadway Construction, LLC

Estimated Construction Cost: $25,577,357

Point of Contact:

Kim Johnson — Community Outreach Specialist

Kim@holtcommunications.net or (772) 801-8736

Sara Storey — FDOT Project Manager

sara.storey@dot.state.fl.us or (772) 429-4921

Jacki Hart, P.E. — Senior Project Engineer

jacki.hart@rsandh.com or (954) 775-6949

 

Scope of Work and Project Improvements

  • Widening SW Port St. Lucie Boulevard from a two-lane undivided roadway to a four-lane divided roadway, separated by an 18-foot wide median with stamped concrete and landscaping to improve safety and traffic operations.
  • Constructing new right-turn lanes on SW Port St. Lucie Boulevard at the north and south approaches to SW Paar Drive to enhance traffic flow.
  • Constructing new signalized intersections with mast arms on SW Port St. Lucie Boulevard at SW Paar Drive and SW McCall Road to improve safety and traffic operations.
  • Upgrading existing sidewalk curb ramps and constructing a new 8-foot to 10-foot wide sidewalk along both sides of SW Port St. Lucie Boulevard and adjacent side streets to improve pedestrian safety and connectivity.
  • Upgrading the existing lighting to LED fixtures and installing new light poles on the east side of the roadway within the project limits to improve safety for motorists and pedestrians.
  • Constructing a new drainage system to enhance functionality and long-term resiliency.
  • Installing signage and pavement markings to improve safety, functionality, and traffic operations.

Traffic Impacts

  • Lane closures are permitted daily, Monday through Friday from 8:00 a.m. to 4:00 p.m.
  • Nighttime work may occur Monday through Friday from 7:00 p.m. to 6:00 a.m.
  • Residential and business access will be maintained.

 