State Road (S.R.) 15/E Main Street Resurfacing, Restoration and Rehabilitation (RRR) Project

Road: S.R. 15

Areas: Western

Project Number: 447664-1-52-01

Project Length: 3.342 miles

Start Date: November 3, 2025

Completion Date: Summer 2026

Contractor: General Asphalt Company, LLC

Estimated Construction Cost: $3.5 million

Point of Contact:

Kevin Wells, Community Outreach Specialist, Phone: 728-235-7218, Email: kevin@holtcommunications.net

Scope of Work

  • The project improvements consist of milling and repaving the existing roadway within the project limits to ensure long-term infrastructure resiliency and safety.
  • Constructing five concrete bus pads throughout the project corridor to enhance transit rider safety and accessibility.
  • Installing curb ramps to enhance pedestrian safety and connectivity, and upgrading signage and pavement markings to enhance visibility and safety.