State Road (S.R.) 5/ U.S. 1 Earman Bridge Replacement Project

Road: S.R. 5

Areas: Northern

Project Number: 442891-2-52-01, 442891-2-52-02

Project Length: 0.175 miles

Project Limits: S.R. 5/US 1 at Northlake Boulevard to just north of S.R. 5/US 1 at Anchorage Drive

Start Date: February 10, 2025

Completion Date: Summer 2027

Contractor: Ferreira Construction Co., Inc

Estimated Construction Cost: $13.7 million

Point of Contact:

Silvana Ojeda, Community Outreach Specialist, Phone:(561) 905-0167, Email: sojeda@corradino.com

Scope of Work

  • The project improvements include replacing the S.R. 5/U.S. 1 bridge over the Earman River to enhance structural safety, traffic flow, and long-term resiliency.
  • The roadway will be widened to add a second right-turn lane from southbound S.R. 5/U.S. 1 onto westbound Northlake Boulevard, improving infrastructure resilience, traffic flow, and safety.
  • Milling and resurfacing of the roadway along S.R. 5/U.S. 1 within the project limits will enhance safety, ride quality, and infrastructure longevity. Additionally, 4-foot and 5-foot bicycle lanes will be added along S.R. 5/U.S. 1 within the project limits to improve safety for all roadway users.
  • Upgrades to drainage, signage, lighting, signalization, pedestrian curb ramps, pavement markings, and the Intelligent Transportation System (ITS) will further enhance infrastructure resilience, traffic flow, transportation efficiency, and safety.
  • Finally, benches and planters will be installed throughout the project limits in the Village of North Palm Beach to improve public spaces.