U.S. 1/State Road (S.R.) 5 Earman Bridge Replacement Project

Road Number: U.S. 1/S.R. 5

Contract Number: T4714

Project Number: 442891-2-52-01, 442891-2-52-02

Project Length: 0.175 miles

Project Limits: U.S. 1/S.R. 5 at Northlake Boulevard to just north of U.S. 1/S.R. 5 at Anchorage Drive

Start Date: February 10, 2025

Completion Date: Summer 2027

Contractor: Ferreira Construction Co., Inc

Estimated Construction Cost: $13.7 million

Point of Contact:

Silvana Ojeda, Community Outreach Specialist

Phone:(561) 905-0167, Email: sojeda@corradino.com

Scope of Work

Project Improvements:

  • Replacing the U.S. 1/S.R. 5 bridge over Earman River to improve safety, traffic flow, and long-term resiliency of the structure.
  • Widening the roadway to add a second right-turn lane from southbound U.S. 1/S.R. 5 onto westbound Northlake Boulevard to improve infrastructure resilience, traffic flow, and safety.
  • Milling and resurfacing the roadway along U.S. 1/S.R. 5 within the project limits to enhance safety, ride quality, and longevity of the infrastructure.
  • Adding 4-foot and 5-foot bicycle lanes along U.S. 1/S.R. 5 within the project limits to improve safety for all roadway users.
  • Upgrading drainage, signage, lighting, signalization, pedestrian curb ramps, and pavement markings throughout the project limits to enhance infrastructure resilience, traffic flow, transportation efficiency, and safety.
  • Upgrading the Intelligent Transportation System (ITS) to enhance transportation efficiency and safety.
  • Installing benches and planters throughout the project limits for the Village of North Palm Beach to enhance public spaces.