State Road (S.R.) 5/U.S. 1 Resurfacing, Restoration, and Rehabilitation Project

Road: S.R. 5

Areas: Central

Project Number: 448415-1-52-01

Project Length: 1.044 miles

Project Limits: S.R. 5/U.S. 1 from Belvedere Road to south of S.R. 704/Okeechobee Boulevard

Start Date: January 20, 2026

Completion Date: Late 2026

Contractor: General Asphalt Company, LLC

Estimated Construction Cost: $3.9 million

Point of Contact:

Kevin Wells — Community Outreach Specialist, Phone: (728) 235-7218, Email: Kevin@holtcommunications.net

Scope of Work

  • The project improvements consist of minor reconstruction, and milling and resurfacing the roadway throughout the project limits of S.R. 5/U.S. 1 from Belvedere Road to south of S.R. 704/Okeechobee Boulevard to enhance infrastructure resilience and safety for the community.
  • Reconstructing curb ramps to meet ADA criteria and replacing portions of the existing sidewalk to improve pedestrian safety, connectivity, and use.
  • Upgrading signing and pavement markings to enhance visibility and safety.
  • Replacing drainage structures within driveways.
  • Adding a new signalized mid-block crosswalk north of Vallette Way.
  • Upgrading pedestrian signalization at Belvedere Road and Flamingo Drive and the crosswalk north of Cranesnest Way.
  • Installing overhead flashing beacons within the school zone north and south of Flamingo Drive.
  • Upgrading lighting to LED fixtures and installing a new light at Flamingo Drive.