DRAG
img

Search here

State Road (S.R.) 607/Emerson Avenue Resurfacing Project

Road: S.R. 607

Areas: St. Lucie County

Project Number: 447651-1-52-01

Project Length: 2.2 miles

Project Limits: S.R. 607/Emerson Avenue from north of SR 614/Indrio Road to south of 25th Street in St. Lucie County

Start Date: January 2025

Completion Date: Spring 2026

Contractor: OHLA-USA, Inc.

Estimated Construction Cost: $6,400,000

Point of Contact:

Samantha Kayser Community Outreach Specialist, Phone: (772) 579-5479, Email: skayser@corradino.com

Scope of Work

  • Project improvements consist of milling and resurfacing the travel lanes to enhance safety and long-term resiliency.
  • Widening the existing 5-foot paved shoulder to 7-feet to enhance safety.
  • Constructing sidewalk (varying from 6 to 12 feet in width) along the east side of S.R. 607/Emerson Avenue from Hibiscus Road to North Road to enhance safety and connectivity for pedestrians.
  • Upgrading curb ramps along existing sidewalks to enhance safety and connectivity for pedestrians.
  • Installing concrete pads at two existing bus stops along northbound SR 607/Emerson Avenue, located approximately 300 feet south of Hibiscus Road and approximately 100 feet north of Belleair Avenue, to enhance safety, functionality, and long-term resiliency.
  • Upgrading signage and pavement markings to improve safety, functionality, and traffic operations.

Documents

Project Photos

Pre Construction

During Construction

Useful Links