DRAG
img

Search here

State Road (S.R.) 7/U.S. 441 at Royal Palm Boulevard/West Copans Road Intersection Improvements Project

Road: S.R. 7

Areas: Northwest

Project Number: 449282-1-52-01, 449282-1-52-02

Project Length: 0.349 miles

Project Limits: S.R. 7/US 441 from NW 24th Street to Royal Palm Boulevard/West Copans Road and Royal Palm Boulevard/West Copans Road from NW 57th Terrace/East River Drive to SR 7/US 441

Start Date: March 2025

Completion Date: Summer 2026

Contractor: Weekley Asphalt Paving, Inc.

Estimated Construction Cost: $3,974,098

Point of Contact:

Trisha Rangil, Community Outreach Specialist, Phone: (754) 283-2929, Email: trisha.rangil@exp.com

Scope of Work

  • The project improvements include milling and resurfacing the roadway within the project limits to ensure long-term infrastructure resilience.
  • Constructing a right-turn lane along southbound SR 7/US 441 to westbound Royal Palm Boulevard/West Copans Road to improve vehicular capacity and mobility.
  • Modifying the median to extend the eastbound Royal Palm Boulevard/West Copans Road left-turn lane to northbound SR 7/US 441 for additional vehicular storage capacity.
  • Upgrading the existing traffic signals with mast arms to enhance long-term infrastructure durability and resilience.
  • Installing 10 new light poles and upgrading existing fixtures to LED lighting to enhance nighttime visibility and safety.
  • Upgrading curb ramps, pavement markings, and signage within the project limits to improve visibility and connectivity.

Documents

Project Photos

Pre Construction

During Construction

Useful Links